Roll-off dumpster delivered for a home renovation
Kitchens, Bathrooms And Whole Floors.

Home Renovation Dumpster Rental

A container for a remodel in progress, sized for fittings and tile rather than for floor area.

Load Profile

What Home Renovation Dumpster Rental Actually Covers

Roll-off dumpster placed in a tight driveway during a home renovation

Renovation waste catches people out because the room is small and the debris is not. Cabinets, counters and a tiled floor fill a container faster than the size of the room suggests.

Book Home Renovation Dumpster

Payload Rating

Tile Is What Changes The Payload

Tile is what changes the answer

Cabinets and lumber are light enough that volume decides. Tile with the mortar bed under it runs 400 to 500 pounds per cubic yard against an allowance of 200, so a floor coming up is what turns a remodel into a weight job. A 20 yard reaches 2 tons at roughly nine cubic yards of it.

  • Cabinets and trimLight, so volume decides on these alone
  • Tile and mortar bed400 to 500 lb per cubic yard
  • Plaster400 to 500 lb per cubic yard, same again
Agency research for sizing, not guarantees. The allowance on a standard roll-off is 200 pounds a cubic yard.
Material Pounds per cubic yard A 20 yard is full at Container
Cabinets and countertopsLight to mediumVolume runs out first15 yard
Lumber and trim300 to 400About 11 cubic yards15 or 20 yard
Plaster and drywall400 to 500About 9 cubic yards20 yard
Tile with the mortar bed400 to 500About 9 cubic yards20 yard
Old subfloor300 to 400About 11 cubic yards20 yard

Site Ops

How It Actually Runs

  • Say if a floor is coming up

    It is the single thing most likely to change which size you need.

  • Driveway protection on request

    Boards under the rails on a finished surface, for an additional charge.

  • 7 days as standard

    Long enough for a phased remodel, and extra days are available.

Tell Us The Job. We Will Size It.

Book online in about a minute, or call and describe it. If a different container fits better, we will say so.

Questions

Home Renovation Dumpster Rental Questions

What size dumpster for a kitchen remodel?

A 15 yard covers most kitchens where the cabinets, counters and appliances are going. Step up to a 20 if the tile floor is coming up as well, because the mortar bed under it is what turns a volume job into a weight one. Tell us the floor area and whether tile is included and we will size it properly.

Can I keep the dumpster for a phased renovation?

Yes. Standard containers include 7 days on site, and extra days run $15 per day if the job runs long. Call before the pickup date and it is straightforward. On a longer remodel a swap partway through often costs less than extending.

How long will I need it for a kitchen remodel?

Most kitchens come out in a day or two, and 7 days covers the tear-out plus the trickle of packaging that follows. Where it runs long is a phased remodel, and on those a swap partway through usually costs less than extending the same container.

Can it sit on a paver or asphalt driveway?

Yes, and this is when to ask for driveway protection. The container rests on rails rather than wheels so the load spreads along its length. On pavers, sealed asphalt or a decorative surface, boards under the rails are cheap insurance, and they are available on request.

What about the old appliances?

Washers, dryers, stoves, dishwashers and water heaters all go in at no extra charge. Anything holding refrigerant is the exception, so a refrigerator, freezer or AC unit needs a word before you load it and we will tell you how it is handled.