$525 Starting
20 yard roll-off dumpster centered on a residential driveway
20 yard dumpster taking shingles from a roof tear-off
20 yard dumpster on an active construction site
20 yard dumpster loaded with wood debris from a demolition
20 yard dumpster on the driveway of a two story home

20 Yard Dumpster Rental

Roof Tear-Offs. Whole Floors.

5.0 from 81+ Google reviews

$525starting at

The largest roll-off we run, and the one to take when you are weighing up two smaller boxes. Same footprint as the 15, a foot more wall.

Book This Size

Or call (401) 213-9777 and describe the job. If a different container fits better, we will say so.

  • Next daystandard service
  • 2 tons includedweighed at disposal
  • 7 days rentalin the starting price

What a 20 Yard Dumpster is for

A 20 yard dumpster starts at $525 and includes 2 tons of weight on a 7 days rental. It suits a roof tear-off, a whole floor of a house, or a renovation running across several rooms at once.

For concrete, dirt or sod, this is the wrong container at any size. Heavy material rides in the dedicated box, which is priced for it.

At a Glance

20 Yard Dumpster Specification

Dimensions, capacity, weight and rental period
SpecificationValueWhat it means
Dimensions14′ L x 8′ W x 5′ HLength by width by height, outside the box
Capacity20 cubic yardsThe volume the container holds
Included weight2 tonsWeighed on a certified scale at disposal
Rental period7 daysStarts the day it is delivered
Over the allowance$145 per tonBilled per ton from the scale ticket
Clearance to place it60 ft straightRoom for the truck to roll it off the back

Capacity

What Actually Fits In It

Every figure with the arithmetic printed underneath rather than a number to take on trust.

  • 7Pickup loads

    Full-size truck, bed heaped rather than level.

    A standard pickup bed is about 3 cubic yards, so 20 divided by 3 is roughly 7.
  • 175 to 200Contractor bags

    42 gallon bags, filled and settled.

    20 cubic yards is 540 cubic feet, and a filled bag settles to roughly 3 cubic feet.
  • 2 tonsIncluded weight

    Weighed on a certified scale at disposal.

    That works out at 200 pounds per cubic yard, the same ratio on every standard size we run.

The limit you reach first is rarely the walls

Space and weight bind independently. Furniture and bagged household waste run out of room first, so those jobs get sized on cubic yards. Plaster, tile, shingle and anything holding water run out of allowance first, and get sized on tons no matter how much room is left above them.

For concrete, dirt or sod, this is the wrong container at any size. Heavy material rides in the dedicated box, which is priced for it.

Past 2 tons, extra weight is billed at $145 per ton against a certified scale ticket. The full density figures sit on the dumpster sizes and weight limits page.

Typical Jobs

What It Gets Booked For

  • Roof tear-off
    This is the one for it

    Single layer asphalt shingle. Sized on squares rather than on how the pile looks.

  • Whole floor renovation
    This is the one for it

    Several rooms stripped at once, plaster and fittings included.

  • Large estate clearance
    This is the one for it

    A full property emptied, furniture and all.

  • Construction and framing waste
    This is the one for it

    New build offcuts, timber, drywall and siding.

  • Concrete or dirt
    Read this first

    Wrong container entirely. Heavy material has its own box at $375.

Book a 20 Yard. Load It Tomorrow.

Tell us the job and the address. If a different container fits better, we will say so.

Questions

20 Yard Questions

How big is a 20 yard dumpster?

A 20 yard measures 14 feet long, 8 wide and 5 high, and holds 20 cubic yards. That is roughly 7 full-size pickup loads. It takes exactly the same driveway space as the 15 yard, because both are 14 feet long. The extra capacity is all in the wall height, which means you are loading higher rather than needing more room.

Is a 20 yard dumpster big enough for a roof?

By volume, comfortably. By weight is the question that matters. Asphalt shingle runs about 250 pounds a square, so 2 tons is gone at around 16 squares of single layer tear-off. A 20 square roof exceeds the allowance before the underlayment goes in. Tell us the square count and whether there are two layers, and we will plan it on weight.

Can I put concrete in a 20 yard dumpster?

No, and this is the expensive one to get wrong. Broken concrete weighs two to three times what household debris does for the same volume, so it passes 2 tons while the box still looks nearly empty and the load gets charged accordingly. Concrete, brick, dirt and sod ride in the dedicated heavy container instead, at $375.